Pittsburgh Traffic

Click to Interact
Type
Location
Description
Time
construction
I-79 SSouthbound
Entry ramp to I-79 Southbound from PA-21 closed due to construction work. Detour in operation - Westbound on Route 21: Stay on Route 21 West, past the I-79 interchange. Turn left onto Route 19 South (Mount Morris Road). Turn left onto Route 2026 East (Rolling Meadows Road). Turn right onto Route 2011 South (Garards Fort Road). Eastbound on Route 21: Stay on Route 21 East, past the I-79 interchange. Turn right onto Route 2026 West (Rolling Meadows Road). Turn left onto Route 2011 South (Garards Fort Road). ​Follow Garards Fort Road, approximately 7 miles. Turn right onto Route 2018 (Kirby Road). Reach the I-79 interchange at Kirby Road..
construction
US-19both ways
Road closed due to construction on US-19 High St both ways between Central Plz and PA-21 Roy Furman Hwy.
construction
PA-21Eastbound
Ramps closed due to construction on PA-21 Roy Furman Hwy Eastbound at I-79 Exit 14.
construction
I-80Westbound
Lane closed due to construction on I-80 Westbound between Exit 81 PA-28 and I-80 W.
construction
I-376both ways
Lane closed due to construction work on I-376 both ways at Exit 80 US-22-BR William Penn Hwy.
construction
I-80Eastbound
Lane closed due to construction on I-80 Eastbound between I-80 W and Exit 81 PA-28.
construction
I-376Eastbound
Lane closed due to construction on I-376 Eastbound between Exit 74 Beechwood Blvd and Exit 79B William Penn Hwy.
construction
I-376Westbound
Lane closed due to construction on I-376 Westbound between Exit 79B William Penn Hwy and Exit 74 Beechwood Blvd.
construction
PA-228Eastbound
Lane closed due to construction on PA-228 Eastbound between Officer Edward Brooks Dr and Old Route 8.
construction
PA-228Westbound
Lane closed due to construction on PA-228 Westbound between Old Route 8 and Officer Edward Brooks Dr.
construction
I-79 SSouthbound
Exit ramp from I-79 Southbound to PA-60 closed due to construction work.
construction
I-376Northbound
Main roadway closed due to construction work on I-376 Northbound from Exit 13 US-224 to Exit 12B US-422-BR Benjamin Franklin Hwy. Detour in operation - From eastbound I-376 Take the Butler/Route 422 East (Exit 15) exit Take the Moravia Street/Route 168 exit on the right Turn right on Route 168 (W. Pittsburgh Road) Turn right onto westbound Route 422 Continue on westbound Route 422 until it merges with westbound I-376 End detour From Route 224 (State Street) Take westbound I-376 to the Mitchell Road/Route 18 (Exit 9) exit Turn left onto Mitchell Road Bear right to take the ramp to eastbound I-376 End detour.
construction
I-79Southbound
Lane closed due to construction on I-79 Southbound between I-79 S and Exit 60B PA-60.
incident
PA-281Westbound
Road closed due to an event on PA-281 Main St Westbound between PA-31 Main St and Edgewood Ave.
construction
I-376Westbound
Shoulder closed due to construction on I-376 Westbound at Exit 64A I-79 Exits 59A,59B.
construction
Buffalo Church Rdboth ways
Lane closed due to construction on Buffalo Church Rd both ways at I-70 Exit 11.
construction
PA-88both ways
Lane closed due to utility work on PA-88 Main St both ways between Washington St and Bridge St.
construction
PA-51Southbound
Lane closed due to utility work on PA-51 Coraopolis Rd Southbound between Forest Grove Rd and Herbst Rd.
construction
I-80Eastbound
Lane closed due to construction on I-80 Eastbound between I-80 W and Exit 62 PA-68.
construction
I-80Westbound
Lane closed due to construction on I-80 Westbound between Exit 62 PA-68 and Exit 60 PA-66 Paint Blvd.